2012 Environmental Management Plan

 SEPIL Environmental Management Plan - Revised (September 2012)

Revised EMP Approval Letter dated 3rd October 2012

Environs Review of Revised EMP dated 26th September 2012

Corrib Pipeline Environmental Management Plan September 2012


SEPIL Environmental Management Plan

Appendix A - Appendices

Appendix A - Aughoose Enviro (a)

Appendix A - Aughoose_Enviro (b)

Appendix A - Aughoose_Enviro (c)

Appendix A - Bay Monitoring Locations

Appendix A - Environmental Monitoring Programme Onshore pipeline

Appendix A - Glengad Enviro

Appendix A - Noise Monitoring Locations

Appendix A - Terminal Enviro.pdf

 

Appendix B - Waste Management Plan

Appendix C - EMP Geotech Risk Reg

Appendix D - ABP Conditions

Appendix E - DCENR Conditions

Appendix F - DEHLG

Appendix G - Vessel Code of Conduct

Appendix H

Appendix I

Appendix J - Complaints Management Process External


Appendix K - Discharge Assimilation Capacity

Appendix K - Discharge Compliance Flow Chart

Appendix K - Discharge Criteria

Appendix K - Figure

Appendix K - Monitoring Flow Charts

 

Appendix L - Aughoose Compound

Appendix L - Bentonite Handling and Monitoring MS

Appendix L - Forested_Area

Appendix L - Leenamore River Crossing

Appendix L - LVI Glengad Compound Access Road

Appendix L - LVI Surface Water Outfall and Cliff Reinstatement

Appendix L - Onshore Pipeline Construction Glengad

Appendix L - Reception Shaft Sheetpiling MS

Appendix L - Recovered Peat Method Statement

Appendix L - Start Shaft Sheet piling MS

Appendix L - Terminal Tie in and Carramore Lake Catchment MS

Appendix L - Tunneling Operations

 

Appendix M - Seasonal Constraints

Appendix N - Chance Finds Procedure Document

Appendix O - Environmental ERP

Appendix P

 

Environs review of the January 2012 EMP

 

EMP Approval Letter 3 February 2012


Action Sheet for Tracking Progress for Compliance with Condition 2 of the Consents of 25th February 2011

Action Tracker from Environ Feb 2012

Action Tracker from Environ dated 7th March 2012

 Action Tracker from Environ dated 16th March 2012

Action Tracker from Environ dated 28th March 2012

Action Tracker from Environ dated 13th April 2012

Action Tracker from Environ dated 2nd May 2012

Action Tracker from Environ dated 5th May 2012

Action Tracker from Environ dated 1st July 2012

Action Tracker from Environ dated 31st August 2012

Action Tracker from Environ dated 11th September 2012

Action Tracker from Environ dated 21st September 2012

Action Tracker from Environ dated 8th November 2012

 

Incident Reports

Incident Report No 3 - Elevated pH readingsfrom Siltbusters

Incident Report No 4 - Elevated Noise levels at AN2 noise monitoring location

Incident Report No 5 - Elevated Noise levels at AN2 noise monitoring location

Incident Report No 6 - Elevated noise levels an ANI and AN2 noise monitoring locations

Incident Report No 7 - Mobilisation to and use of an impact piling hammer at Aughoose construction site

February 2012 Pipeline Environmental Notification piling hammer

March 2012 Report from Environ Re Impact Piling Hammer at Aughoose

Incident Report No 8 - Noise Exceedance at NSR2

Letter to SEPIL (23-07-2012) re Incident Report No 8 - Noise Exceedance at NSR2

ENVIRON Preliminary Comments to Incident Report No 8 - Noise Exceedance at NSR2

email from SEPIL attaching revised Incident Report No 8 - Noise Exceedance at NSR2

Incident Report No 8 (Revised) - Noise Exceedance at NSR2

Environ Review of Incident Report No 8 (Revised) - 1 August 2012

SEPIL Response of 3 August 2012 to Environ review of Incident Report No.8

Letter to M Crothers SEPIL (07.08.2012) re Incident Report No. 8 - Noise Exceedance at NSR2

Letter dated 21st October from Sol Accoustics to Environ re High Level Review of Noise and Weather data submitted by SEPIL

E-Mail from Environ to DCENR re Noise Exceedance

Incident Notification No 9 (exceedence for dust deposition at the dust monitoring location GD2

Incident Notification No 10 (revised) (elevated hydrocarbon concentration)

Incident Notification No 11 (discharge of silt laden surface water at SW 12

Incident Notification No 12 (elevated levels of turbidity, total suspended solids and hydrocarbon/diesel at SW10)

Environ's Review of Incidents Nos 9, 10, 11 and 12

Letter to SEPIL re Environmental Notification Reports 009, 010, 011 and 012


Bathymetric Survey - Sruwaddaccon Bay

Addendum to Method Statement for Tunnelling Operations

E-Mails between DCENR,SEPIL and National Parks and Wildlife Service

Approval Letter to SEPIL dated 19th October 2012 re Bathymetric Survey

Offshore Pipeline Protection Works

EMP Pipeline Protection Works

Environs review of Offshore Pipeline Protection Works

Approval letter to SEPIL dated 14th September 2012 re Offshore Pipeline protection works

Umbilical Protection Boulder Relocation Method Statement

Addendum to Method Statement for Umbilical Protection and Boulder Relocation

Environs Review of Umbilical Protection and Boulder Relocation

Approval letter Umbilical and Boulder works 22 05 2012

Offshore Pipeline Survey and Associated Maintenance Works EMP

Offshore Pipeline Survey for May 2012

25 4 Environs Review of Offshore Pipeline Survey and Associated Maintenance Works

Approval letter to SEPIL 09 05 2012 re Offshore Pipeline Survey and associated Maintenance Works

Hydrotesting and Dewatering of the Corrib Offshore Pipeline in May 2012

Clarification re DCENR PUDAC approval letter to SEPIL 24 05 2012

Hydrotest discharge chemical composition email correspondence 05 2012

Precommissioning noise monitoring and assessment protocols email correspondence 05 2012.pdf

Addendum to Method Statement for Pre commissioning (including hydrotesting and dewatering)

Environs review of hydrotest and de-watering works 10-04-2012

PUDAC approval covering letter 17-04-2012

PUDAC Corrib Hydrotest and dewatering consent April 2012

Proposed Addendum to the Method Statement for Pre-Commissioning Activities, Glengad Compound

Addendum to Method Statement for Pre commissioning

Environs review of pre commissioning of offshore pipeline work 10 04 2012

Letter dated April 19th to SEPIL re proposed addendum to MS for pre commissioning activities

LVI Drainage Arrangements

Letter dated 30-03-2012 from G Costello SEPIL re LVI drainage arrangements

SEPIL Technical note LVI Drainage Arrangements

Drawing 05-2377-01-C0-0-26R03

Drawing 05-2377-01-C0-0-51_R04

Drawing 05-2377-01-C0-0-61_R04

Environs Review on LVI Drainage.doc

SEPIL's response to Environ on LVI drainage

DCENR approval of LVI Drainage Arrangements


Agreement of Addendum to Appendix K of the Corrib EMP

Agreement of Appendix K of the Corrib EMP

Email from NPWS re Condition 28 of the letter of Consent dated 25 02 2011

24. 4. 2012 approval email from Inland Fisheries Ireland 

Monitoring Progress Report no 7 from Environ

Action Tracker from Environ Feb 2012

Letter to Agnes McLaverty regarding Environs most recent monitoring report ​