Quantified Risk Assessment

‚Äč

In March 2002, Mr. Andrew Johnston, a consultant engaged by the (then) Department of Marine and Natural Resources conducted an evaluation of the Quantified Risk Assessment and prepared a report on his evaluation of the Onshore Pipeline Design Code.

In 2005, a further independent review of the Quantified Risk Assessment was conducted by AEA Technology on behalf of the (then) Department of Marine and Natural Resources.

All Quantified Risk Assessment documents can be viewed below.